Skip links

C80 Catwalk & Tubular Handling System

C80 Catwalk & Tubular Handling System

Category:

Description

From the pipe rack to the drill floor, GTE Catwalk Sys – tems enable a “hands-o” approach to Tubular Running Services (TRS). The TRS is not only safer and simplified, with the C80 Triple CATWALK you can speed productiv – ity to astonishing results as it has a maximum tubular string length of 100ft.

The Top Drive elevator takes over the tubular lifting as the Triple Catwalk oers the tubes right up to the drill floor. Temporary storage of the tubulars in the mouse hole is no longer necessary and this again decreases handling and drives up productivity.

The C80 Triple CATWALK was specifically designed and fabricated to meet the productivity and safety needs of some of the biggest players in drilling. The design uti – lised the best technologies and stress analysis together 3-D modelling. The “Triple” refers to the extraordinary capacity to load a string of 3 tubulars to the rig floor at any one time delivering up to 100 ft in one lifting cycle. Our catwalks are designed for fast rig-up and rig down and we also oer a range for optional equipment includ – ing the Skid Walking System for finite alignment.

This website uses cookies to improve your web experience.
Home
Account
Cart
Search